Test service progress details

 

Test planning

Requirements to be defined

 

The test complexity does not only depend on the components to test, e.g. the source code, but also on the requirements:
Norms and standards to be complied with
Test methods to be applied
Test environment
Scope of documentation
Utilized test environment

 

 

Cost and time estimation

The cost and duration of the implementation will be estimated when the source code is available and it is based on its complexity combined with the customer's requirements. For testing during the development process, the estimation is based on the estimated project size stated by the customer.


Test implementation


Test environment

The creation and execution of the tests will be done using Razorcat's own test tools or with the ones you are using. Therefore the utilized embedded compiler or the standard-compiler will be used. The test system will either consist of your hardware or of the PC simulation.

 

Test tools of Razorcat

Test management ITE ITE

 

Test Design CTE CTE and Tessy Tessy

 

Test Implimentation Tessy

 

The list of standard target compilers and debuggers/emulators supported by TESSY can be found at Supported development tools. If the debugger and compiler you are using is not supported by TESSY, we can adapt it if necessary.


Test creation

The test cases are created according to the customized test strategy and using available specifications and/or the source code.

Existing configurations, e.g. for the compiler, are used for the test execution. The TESSY configuration is adopted or created by us.

 

Results delivery

Test strategy

We create a test strategy as part of the test plan which is adapted for your project including your requirements, requirements of standards and our test guideline.

 

 

Results and delivery


Documentation


Test specification

Specification of each test case, if requested using the classification tree method
Description of the intension of each test case.

Test result report

Includes the unit test specification
Test result report of each test case by comparing the expected and the actual values
Coverage report
Easy understandable representation

Test incident report
Unique ID number used to identify each issue which is found
Description of the cause and effect of errors
Recommendation for error correction

Additional documents
Test strategy
Test guidelines
Test plan (Section about unit test)

 

Data
Entire test database for each source code file, so that the tests can be tracked and used for regression testing.

Configuration
Entire configuration of the used tools
Documentation for the reconstruction of the tests


Additional services by arrangement

Installation on-site
Consulting
TESSY license for the duration of the implementation phase

 

Data

Entire test database for each source code file, so that the tests can be tracked and used for regression testing.

Configuration
Entire configuration of the used tools
Documentation for the reconstruction of the tests


Additional services by arrangement

Installation on-site

Consulting
TESSY license for the duration of the implementation phase

 

 

 

If your utilized compiler is not part of the matrix, send us an E-Mail.


Examples of errors detections


Deviations between the module design specification and the implementation
Missing or wrong implementation
Dead code (e.g. conditions that will not be achieved)
Memory violation (e.g. wrong memory section or wrong data type)
Overflow/underflow
NULL pointer access
Division by zero
Uninitialized variables
Infinite (endless) loop
C implementation error (e.g. using brackets, priority of operators)
C memory access fault (e.g. wrong, missing or implicit cast)
Compiler errors and warnings

 

No Bugs

 

Testing Service You're interested in our testing service or have any questions? Please email or call

 


Unit test

 

The service includes the specification, creation and execution of test cases based on the Module design specification or on the source code of the application under test.

 

Your advantages


Test complexity adapted to your needs
→ economical und saving resources
Experienced persons of contact
→ also beyond the test process
Early scheduled tests
→ error detection and correction at an early state
Developer != tester
→ independent and neutral testing

 

Download the Test Flyer (click here)